Level 2

Company Announcements

Q2 Production Release

Related Companies

RNS Number : 7672B
Vedanta Resources PLC
09 October 2015
 

Vedanta Resources Plc

 Production Release for the Second Quarter

And Half Year Ended 30 September 2015 

                                                                                                                          9 October 2015

Q2 Highlights

·    Oil & Gas: Q2 production up 6% and H1 production in line with guidance

o Rajasthan production 3% higher at 168,126 boepd

o Ravva and Cambay production 19% higher at 37,236 boepd

·    Zinc-India: Strong mined and refined metal production; integrated silver production up 64%

·    Aluminium: Stable volumes from existing smelters; cost reduction initiatives in progress;  further pots at Jharsuguda-II smelter to ramp up in Q3

·    Iron Ore: Mining operations recommenced at Goa

·    Copper-India: Stable operations at 94% capacity utilisation

·    Copper-Zambia: 12% higher mined metal production; lower cost of production

·    Power: Unit-1 of Talwandi Sabo achieved 86% availability

·   Continued optimisation of opex and capex to maximise free cash flow and reduce net debt

 

Tom Albanese, Chief Executive Officer, Vedanta Resources plc, said: "Our diversified asset portfolio has delivered a strong operating performance during the quarter, including record production from our tier-1 Zinc mines and lower costs at Copper-Zambia. We are continuing to drive efficiency improvements and optimise opex and capex across the business. While the near-term market outlook is challenging, we believe we have the right mix of commodities to benefit from future demand in India and globally."

 

Oil and Gas

 

Q2

Q1

H1

Particulars

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

OIL AND GAS (boepd)

 

 

 

 

 

 

 

Average Daily Total Gross Operated Production (boepd) 1

214,247

204,128

5%

217,935

216,081

215,301

-

Average Daily Gross Operated Production (boepd)

205,361

194,508

6%

209,738

207,538

206,125

1%

   Rajasthan

168,126

163,262

3%

172,224

170,164

173,158

(2%)

   Ravva

26,064

20,596

27%

28,556

27,303

22,259

23%

   Cambay

11,172

10,651

5%

8,958

10,071

10,708

(6%)

Average Daily Working Interest Production (boepd)

128,021

123,178

4%

130,565

129,286

130,502

(1%)

   Rajasthan

117,688

114,283

3%

120,557

119,115

121,211

(2%)

   Ravva

5,864

4,634

27%

6,425

6,143

5,008

23%

   Cambay

4,469

4,260

5%

3,583

4,028

4,283

(6%)

Total Oil and Gas Production (million boe)

 

 

 

 

 

 

 

Oil & Gas- Gross

18.89

17.89

6%

19.09

37.98

 37.72

1%

Oil & Gas-Working Interest

11.78

11.33

4%

11.88

23.66

 23.88

(1%)

 

Average gross production for H1 FY2016 was at 207,538 barrels of oil equivalent per day (boepd), slightly up by 1% year-on-year (y-o-y). The increase in production was mainly driven by consistent performance of our offshore assets - Ravva and Cambay, through effective reservoir management practices and better than expected results from the Ravva infill drilling campaign.

 

In Q2 FY2016, average gross operated production and working interest production were up 6% and 4% y-o-y at 205,361 boepd and 128,021 boepd, respectively. Production at Rajasthan was up 3% y-o-y at 168,126 boepd, primarily driven by inline reservoir performance at Mangala and production from additional infill wells in the Aishwariya field. At Mangala EOR, the injection ramp up plan is on track and work on the drilling and surface facilities is ongoing. Gross production from DA (Development Area) -1 and DA-2 averaged at 147,443 boepd and 20,683 boepd, respectively.

 

In Q2 FY2016, gas production from the RDG field increased to an average rate of
30 mmscfd from 19 mmscfd in Q1 FY2016, recording a peak production of 34 mmscfd. This was largely on account of optimization of existing infrastructure.

 

In Q2 FY2016, both the offshore assets registered a gross average production of 37,236 boepd, an increase of 19% y-o-y. Production at Ravva grew 27% to 26,064 boepd due to consistently higher gas production, effective infill drilling campaign and prudent reservoir management. Cambay saw a production growth of 5%, driven by effective reservoir management practices including well intervention campaign undertaken in the last quarter.

 

Zinc India

 

Q2

H1

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

   Mined metal content

240

 

213

13%

232

472

 

376

26%

   Refined Zinc - Total

211

181

17%

187

398

321

24%

   Refined Zinc - Integrated

211

174

22%

187

398

312

28%

   Refined Zinc - Custom

-

7

-

-

-

9

-

   Refined Lead - Total 2

40

30

34%

31

71

61

17%

   Refined Lead - Integrated

39

26

53%

27

67

47

41%

   Refined Lead - Custom

1

5

(72%)

3

4

14

(67%)

   Saleable Silver - Total

(in '000 ounces) 3

3.59

2.58

39%

2.42

6.01

5.22

15%

   Saleable Silver - Integrated

3.54

2.17

64%

2.38

5.92

3.95

50%

   Saleable Silver - Custom

0.05

0.41

(89%)

0.05

0.09

1.27

(93%)

 

During Q2, mined metal production was at 240,000 tonnes 13% higher y-o-y. The increase was driven by higher ore production across all mines.

 

Refined metal production during the quarter was higher than mined metal production primarily on account of conversion of existing inventory and enhanced smelter efficiency. Integrated saleable zinc, lead and silver metal production during the quarter increased by 22%, 53% and 64% respectively y-o-y. Silver production benefited from higher ore grades and volumes from the Sindesar Khurd (SK) mine.

 

The cost of production (COP) of zinc excluding royalty was lower at c.US$7716 per tonne compared with US$799 per tonne in Q1 FY2016. The contribution towards District Mineral Foundation has been notified by the Government of India at 30% of royalty paid for the existing mines, effective 12 January 2015. 

 

Zinc International

 

Q2

Q1

H1

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

Zinc International

63

79

(20%)

70

133

163

(18%)

  Refined Zinc - Skorpion

17

27

(38%)

26

42

60

(30%)

Mined metal content - BMM

16

16

-

15

31

31

-

Mined metal content - Lisheen

31

36

(15%)

29

60

72

(17%)

 

Refined zinc metal production at Skorpion was at 17,000 tonnes, lower than the corresponding prior quarter due to an unplanned shutdown and a 30 day planned maintenance shutdown that commenced on 16th September.

 

Zinc-lead mined metal production at Lisheen was lower due to the ramp down at Lisheen, which is scheduled to cease production in November 2015.

 

COP in Q2 FY2016 at c. US$ 1,477 per tonne was higher compared with US$ 1,409 per tonne in Q1 FY2016, as lower cost Lisheen mine ramps down together with lower refined production from Skorpion.

 

At the Gamsberg project, pre-stripping commenced in July 2015 as per the rephased plan. As previously announced, the project is being developed using a modular approach, with project execution carried out in a phased manner that allows flexibility to manage the capital expenditure programme.

 

Iron Ore

 

Q2

Q1

H1

Particulars (in million dry metric tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

IRON ORE

 

 

 

 

 

 

 

   Sales

0.6

0.6

5%

0.5

1.2

1.1

8%

Goa

-

-

0%

-

-

-

0%

Karnataka

0.6

0.6

5%

0.5

1.2

1.1

8%

   Production of Saleable Ore

0.8

0.3

-

0.2

1.0

0.3

-

Goa

0.0

-

0%

-

0.0

-

0%

Karnataka

0.8

0.3

-

0.2

1.0

0.3

-

Production ('000 tonnes)

 

 

 

 

 

 

 

Pig Iron

150

154

-2%

170

320

300

7%

 

At Goa, the remaining approvals were received for production of saleable ore of 5.5 mtpa, during the quarter and mining restarted during the quarter.  Production will progressively be ramped up in Q3 FY2016. The first export shipment is expected in October 2015.

 

At Karnataka, production in Q2 was higher at 0.6 million tonnes.

                                   

Production of pig iron was lower at c.150kt primarily due to planned maintenance activities at the plant.

 

Copper ― India and Australia

 

Q2

Q1

H1

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

  Copper -  Cathodes

94

100

(6%)

98

193

166

16%

  Tuticorin Power Plant Sales (million units)

118

183

(35%)

175

293

319

(8%)

 

Copper cathode production was 94,000 tonnes in Q2 FY2016, 6% lower y-o-y, primarily due to a maintenance shutdown at the smelter. Additionally, there was a shutdown in late September that will impact the cathode production for Q3 FY2016.  The smelter is now producing at a normalised level.

 

The 160MW power plant at Tuticorin operated at lower Plant Load Factor (PLF) of 76% in Q2 compared to 94% last year due to reduction in power off-take by the Tamil Nadu Electricity Board (TNEB) on account of seasonally lower demand.

 

Copper ― Zambia

 

Q2

Q1

H1

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

Mined metal

33

30

12%

29

62

59

5%

Copper - Total

47

34

39%

43

90

76

19%

  Integrated

32

27

18%

28

60

56

9%

  Custom

15

7

115%

15

30

20

51%

 

Mined metal production was at 33,000 tonnes for Q2, 12% higher than the corresponding prior quarter.

 

At Konkola, there have been improvements in mobile equipment availability through the implementation of improved planned maintenance practices and the roll-out of a rebuild programme.  This has contributed to an estimated 20% increase in production when compared to Q2 FY2015 and 18% higher compared to
Q1 FY2016.  The rehabilitation work on Shaft #4 has incrementally improved hoisting capacity and is expected to be completed by Q3 FY2016.

 

At Nchanga, although production was affected by throughput constraints at the mill and reduced dump truck availability, the TLP primary copper production remained stable at 4,800 tonnes per month after the completion of maintenance programmes to raise the reliability of major areas in the plant.

 

Although custom volumes in Q2 were constrained by the availability of concentrates in the local market, production has improved markedly compared to the corresponding quarter in FY2015.

 

The increased production volumes and cost efficiencies have improved the C1 cost for Q2 FY2016 to c. USc 190/lb (excluding the impact of Kwacha depreciation), compared with USc 213/lb in Q1 FY2016.

 

Effective 1st July, the Government of the Republic of Zambia has approved the reversion of the mineral royalty rates from the 20% to 9% for open pit operations and from 8% to 6% for underground operations, together with the reintroduction of corporate income tax.

 

Following the receipt of the 30% force majeure notice from Copperbelt Energy Corporation in July 2015, KCM embarked upon energy savings programmes including reduction of refinery operations and produced c. 80% of copper in the form of cathodes, with the balance being sold as anodes in Q2. We achieved an improvement of 4.6% in power consumption during the quarter.  The price of imported power to replace the reduced supply is unsustainable in the long run and discussions with interested parties, including the government, are underway.

 

Aluminium

 

Q2

Q1

H1

Particulars (in'000 tonnes, or as stated)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

  Alumina - Lanjigarh

272

226

20%

269

541

460

18%

  Total Aluminum Production

233

222

5%

232

464

424

9%

      Jharsuguda-I

130

138

(6%)

132

262

270

(3%)

      Jharsuguda- II4

19

-

 

20

38

-

 

      245kt Korba-I

65

65

1%

62

127

125

2%

      325kt Korba- II

19

19

(1%)

18

37

29

26%

 

The Lanjigarh alumina refinery produced 272,000 tonnes in Q2, 20% higher than the corresponding prior quarter. The production was stable at the 500kt Jharsuguda-I and 245kt Korba-I smelters.

 

The 325kt Korba-II smelter produced 19,000 tonnes during Q2 FY2016 with 83 pots operational. However, the ramp up of further pots has been temporarily put on hold due to weaker LME and premium. The high cost rolled product facility at BALCO which produced c. 46,000 tonnes in FY2015 has been temporarily closed, which will result in cost savings. We will continue to sell ingots and wire rods from BALCO.

 

The 1.25 million tonnes Jharsuguda-II smelter produced 19,000 tonnes in Q2 with
80 pots operational. We are in discussions with the Government authorities for using power from the 2,400 MW power plant for further ramp up of pots of the first line of 312 kt at this smelter, and expect the ramp up to commence in Q3 FY2016.

 

Due to non-availability of captive bauxite and cost optimization drive across the business, production capacity at the Lanjigarh alumina refinery has been reduced to a single stream and it will now operate at a capacity of c. 800 kt. The alumina COP for the month of September dropped by 20% to c. $299 per tonne against $340 per tonne in Q1 as a result of this optimisation.

 

Hot metal cost at Jharsuguda-I was at US$1,599 per tonne compared to US$1,740 per tonne in Q2 FY2015. Hot metal cost at Korba- I was at US$1,674 per tonne compared to US$2,089 per tonne in Q2 FY2015. Costs were lower mainly on account of depreciation of the Indian rupee, lower alumina and other costs. The COP at Jharsuguda was impacted by higher coal costs.

 

The two CPP units (300MW each) of the 1,200MW power plant at BALCO are expected to commence production in H2 FY2016.

 

Power

 

Q2

Q1

H1

Particulars (in million units)

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

Total Power Sales

2,718

2,028

34%

3,070

5,789

4,627

25%

Jharsuguda 2400 MW

1,554

1,653

(6%)

2,266

3,820

3,807

-

MALCO

127

204

(38%)

193

320

433

(26%)

HZL Wind Power

158

170

(7%)

127

286

316

(10%)

TSPL

693

-

--

384

1,077

-

 

BALCO 270MW Power

28

1

-

99

128

71

80%

Balco 600 MW

158

-

 

-

158

-

 

 

The Jharsuguda 2,400MW power plant operated at a PLF of 32% in Q2, lower than Q2 FY2015 and Q1 FY2016 primarily due to lower demand and softer power rates.

 

The first 660MW unit of TSPL operated at 86% availability during the quarter. TSPL's Power Purchase Agreement with the Punjab State Electricity Board (PSEB) compensates based on the availability of the plant. The balance two units are expected to commence production in H2 FY2016.

 

MALCO power plant operated at lower PLF due to lower demand.

 

Of the two 300MW IPP units of the 1,200 MW Korba Power Plant, the first 300 MW unit has been commissioned. It was capitalized in August 2015 and sold 158 million units. The second commercial unit is expected to be commissioned in Q3 FY2016.

 

Financial Update

In light of the current market conditions, we are focused on optimising our opex and capex, increasing free cash flow and reducing net debt. During the quarter, several initiatives and programmes to generate cash savings, including a reduction of working capital, have been implemented across our businesses. These initiatives have resulted in an improved cost performance and lower net debt at the end of the quarter. Net debt at the end of the quarter is expected to be below US$ 8bn and we are confident of meeting our covenants at Vedanta Resources plc as at 30 September 2015.   

 

 

Production Summary (Unaudited)

 (in '000 tonnes, except as stated)

 

Q2

Q1

H1

Particulars

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

OIL AND GAS (boepd)

 

 

 

 

 

 

 

Average Daily Total Gross Operated Production (boepd) 1

214,247

204,128

5%

217,935

216,081

215,301

-

Average Daily Gross Operated Production (boepd)

205,361

194,508

6%

209,738

207,538

206,125

1%

   Rajasthan

168,126

163,262

3%

172,224

170,164

173,158

(2%)

   Ravva

26,064

20,596

27%

28,556

27,303

22,259

23%

   Cambay

11,172

10,651

5%

8,958

10,071

10,708

(6%)

Average Daily Working Interest Production (boepd)

128,021

123,178

4%

130,565

129,286

130,502

(1%)

   Rajasthan

117,688

114,283

3%

120,557

119,115

121,211

(2%)

   Ravva

5,864

4,634

27%

6,425

6,143

5,008

23%

   Cambay

4,469

4,260

5%

3,583

4,028

4,283

(6%)

Total Oil and Gas Production (million boe)

 

 

 

 

 

 

 

Oil & Gas- Gross

18.89

17.89

6%

19.09

37.98

 37.72

1%

Oil & Gas-Working Interest

11.78

11.33

4%

11.88

23.66

 23.88

(-1%)

ZINC INDIA

 

 

 

 

 

 

 

   Mined metal content

240

 

213

13%

232

472

 

376

26%

   Refined Zinc - Total

211

181

17%

187

398

321

24%

   Refined Zinc - Integrated

211

174

22%

187

398

312

28%

   Refined Zinc - Custom

-

7

-

-

-

9

-

   Refined Lead - Total 2

40

30

34%

31

71

61

17%

   Refined Lead - Integrated

39

26

53%

27

67

47

41%

   Refined Lead - Custom

1

5

(72%)

3

4

14

(67%)

   Saleable Silver - Total (in '000 ounces) 3

3.59

2.58

39%

2.42

6.01

5.22

15%

   Saleable Silver - Integrated (in '000 ounces)

3.54

2.17

64%

2.38

5.92

3.95

50%

   Saleable Silver - Custom (in '000 ounces)

0.05

0.41

(89%)

0.05

0.09

1.27

(93%)

ZINC INTERNATIONAL

63

79

(20%)

70

133

163

(18%)

  Refined Zinc - Skorpion

17

27

(38%)

26

42

60

(30%)

Mined metal content - BMM

16

16

-

15

31

31

-

Mined metal content - Lisheen

30

36

(17%)

29

60

72

(17%)

IRON ORE

 

 

 

 

 

 

 

   Sales

0.6

0.6

5%

0.5

1.2

1.1

8%

Goa

-

-

-

-

-

-

-

Karnataka

0.6

0.6

5%

0.5

1.2

1.1

8%

   Production of Saleable Ore

0.8

0.3

-

0.2

1.0

0.3

-

Goa

0.0

-

-

-

0.0

-

-

Karnataka

0.8

0.3

-

0.2

1.0

0.3

-

Production ('000 tonnes)

 

 

 

 

 

 

 

Pig Iron

150

154

(2%)

170

320

300

7%

 

 

 

 

 

(in '000 tonnes, except as stated)

 

Q2

Q1

H1

Particulars

FY2016

FY2015

% change YoY

FY2016

FY2016

FY2015

% change YoY

COPPER INDIA & AUSTRALIA

 

 

 

 

 

 

 

  Copper - Mined metal content

-

-

0%

-

-

-

0%

  Copper -  Cathodes

94

100

(6%)

98

193

166

16%

  Tuticorin Power Plant Sales (MU)

118

183

(35%)

175

293

319

(8%)

COPPER   ZAMBIA

 

 

 

 

 

 

 

Mined metal

33

30

12%

29

62

59

5%

Copper - Total

47

34

39%

43

90

76

19%

  Integrated

32

27

18%

28

60

56

9%

  Custom

15

7

115%

15

30

20

51%

ALUMINIUM

 

 

 

 

 

 

 

  Alumina - Lanjigarh

272

226

20%

269

541

460

18%

  Total Aluminum Production

233

222

5%

232

464

424

9%

      Jharsuguda-I

130

138

-6%

132

262

270

-3%

      Jharsuguda- II4

19

-

 

20

38

-

 

      245kt Korba-I

65

65

1%

62

127

125

2%

      325kt Korba- II

19

19

-1%

18

37

29

26%

POWER

 

 

 

 

 

 

 

Total Power Sales

2,718

2,028

34%

3,070

5,789

4,627

25%

Jharsuguda 2400 MW

1,554

1653

(6%)

2,266

3,820

3,807

-

MALCO

127

204

(38%)

193

320

433

(26%)

HZL Wind Power

158

170

(7%)

127

286

316

(10%)

    TSPL

693

-

-

384

1,077

-

 

    BALCO 270MW Power

28

1

 

99

128

71

80%

    BALCO 600 MW

158

-

-

-

158

-

-

Ports - VGCB (in million tonnes) 5

 

 

 

 

 

 

 

Cargo Discharge

2.1

1.7

23%

1.6

3.6

3.5

4%

Cargo Dispatches

1.7

1.8

(6%)

1.7

1.7

3.5

(52%)

 

1.     Including Internal Gas Consumption

2.    Excluding captive consumption of 1,514 tonnes in Q2 FY2016 vs. vs. 1,762 tonnes in Q2 FY2015 and 3,697 tonnes in H1 FY 2016 vs. 3,451 tonnes in H1 FY2015

3.    Excluding captive consumption of 251,000 ounces in Q2 FY2016  vs. 291,000 ounces in Q1 FY2014 and 613,000 ounces in H1 FY2016 vs. 574,000 ounces in H1 FY2015

4.     Includes trial run production of 19 kt in Q2 FY2016, 20 kt in Q1 FY2016 and 38 kt in H1 FY2016

5.     VGCB refers to Vizag General Cargo Berth

6.     Cost with IFRIC 20 impact

 

 

For further information, please contact:

Communications

 

Roma Balwani

President - Group Communications, Sustainability

and CSR

Tel: +91 22 6646 1000

gc@vedanta.co.in

 

Investors

 

Ashwin Bajaj

Director - Investor Relations

 

Anshu Goel

Vice President - Investor Relations

 

Radhika Arora

Associate General Manager - Investor Relations

 

 

Finsbury

 

Daniela Fleischmann

Tel:  +44 20 7251 3801

Vedanta@finsbury.com

 

 

 

 

 

Tel:  +91 22 6646 1531

ir@vedanta.co.in

 

 

About Vedanta Resources plc

Vedanta Resources plc ("Vedanta") is a London listed diversified global natural resources major. The group produces aluminium, copper, zinc, lead, silver, iron ore, oil & gas and commercial energy. Vedanta has operations in India, Zambia, Namibia, South Africa, Ireland, Liberia, Australia and Sri Lanka. With an empowered talent pool globally, Vedanta places strong emphasis on partnering with all its stakeholders based on the core values of entrepreneurship, excellence, trust, inclusiveness and growth. For more information, please visit www.vedantaresources.com.

 

Disclaimer

This press release contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements. We do not undertake to update our forward-looking statements.

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGUBDGXXGBGUC