Register for Digital Look

Company Announcements

Conditional Placing, CVA and Appointment of Nomad

Related Companies

By LSE RNS

RNS Number : 9931S
Cogenpower PLC
06 October 2017
 

 

THIS ANNOUNCEMENT AND THE INFORMATION CONTAINED HEREIN IS RESTRICTED AND IS NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN, INTO OR FROM THE UNITED STATES, AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA OR ANY OTHER JURISDICTION IN WHICH SUCH RELEASE, PUBLICATION OR DISTRIBUTION WOULD BE UNLAWFUL.

THIS ANNOUNCEMENT IS FOR INFORMATION PURPOSES ONLY AND DOES NOT CONSTITUTE OR CONTAIN ANY INVITATION, SOLICITATION, RECOMMENDATION, OFFER OR ADVICE TO ANY PERSON TO SUBSCRIBE FOR, OTHERWISE ACQUIRE OR DISPOSE OF ANY SECURITIES IN COGENPOWER PLC OR ANY OTHER ENTITY IN ANY JURISDICTION. NEITHER THIS ANNOUNCEMENT NOR THE FACT OF ITS DISTRIBUTION, SHALL FORM THE BASIS OF, OR BE RELIED ON IN CONNECTION WITH ANY INVESTMENT DECISION IN RESPECT OF COGENPOWER PLC. MEMBERS OF THE PUBLIC SHALL NOT BE ELIGIBLE TO TAKE PART IN THE PROPOSED PLACING, WHICH IS TO BE LIMITED TO PERSONS SELECTED BY PETERHOUSE AND WHO CONFIRM THEIR PARTICIPATION BY ENTERING INTO A PLACING CONFIRMATION LETTER WITH PETERHOUSE AS AGENT OF THE COMPANY IN A PRESCRIBED FORM. 

 

FOR IMMEDIATE RELEASE

 

6 October 2017

 

Cogenpower plc

("Cogenpower" or the "Company" or the "Group")

 

Company Voluntary Arrangement ("CVA")

Proposed placing to raise £0.55 million ("Placing")

Posting of Circular and Notice of General Meeting ("GM")

Board Change

Appointment of Nominated Adviser

Total voting rights

 

Summary

 

On 26 June 2017, the Company announced the suspension of trading of its securities on AIM for failing to publish its audited annual report and accounts for the year ended 31 December 2016. The Company also announced that the Company's working capital position was constrained due to a dispute over the payment of green certificate incentives by the GSE, the Italian supervisory agency for energy incentives.

 

Notwithstanding the publication of the Company's 2016 Accounts and Half-Yearly Report ended 30 June 2017 on 29 September, the Company's shares remain suspended from trading, whilst the Company was in advanced discussions on a potential fundraising from new investors to put the Company in an improved working capital position.

 

There had been ongoing discussions with major infrastructure funds and other investors with regards to the provision of further funding for the Group to extend its existing operations and undertake new projects. However, these were not successful and the Board concluded that it was now in the best interests of the Company to enter the following arrangements:

 

·     Proposals have been filed in the High Court and will today be dispatched to the creditors of Cogenpower, together with a notice convening a Creditors Meeting, the purpose of which is to consider the Directors' proposal for a Company Voluntary Arrangement ("CVA"), subject to shareholder approval;

 

·     Peterhouse Corporate Finance Limited has, as Broker to the Company, conditionally raised £550,000 before expenses by way of the Placing at £0.0025 per Ordinary Share. The Placing is conditional on, inter alia, the passing of the Resolutions to be proposed at a General Meeting of the Company, CVA Approval and Re-trading. The proceeds of the Placing will allow the Company to implement the CVA, if approved, and to provide the Company with working capital to allow it to continue to trade; further details of which are set out below.

 

Shareholders should be aware that the Placing is conditional upon CVA Approval, the passing of the Resolutions and Re-trading. If any of the above conditions are not satisfied, then the Placing will not proceed and since as the Company would then have insufficient working capital to continue to trade as a going concern and, in the absence of any other source of funding, the Joint Supervisor may have no alternative but to place the Company into creditors' voluntary liquidation.   

 

The proceeds of the Placing will be used to settle outstanding Creditors under the terms of the CVA and the remainder will be used to ensure the Company has ongoing working capital. Following the settlement of Creditors as part of the proposed CVA, the Company will be free of debt.

 

The Placing Shares, when issued, will be fully paid and will rank pari passu in all respects with the existing Ordinary Shares, including the right to receive all dividends and other distributions declared, made or paid after the date of issue. Application will be made for the Placing Shares to be admitted to trading on AIM and, subject to Creditors' approval of the CVA and Shareholders' approval of the Proposals, Admission is expected to take place on or around 25th October 2017.

 

Business Review

 

The Board is undertaking an extensive assessment of the Company's current business. The assessment includes consideration by the Board of the potential disposal of the Group's remaining operating subsidiaries.  Shareholders should note that the Board's current belief that it may be in the best interests of the Company and Shareholders to dispose of the Group's operating business in as simple and as least costly a manner as possible.  Given that the Company would not wish to provide anything more than basic warranties as to ownership to any purchaser, and given the intended timescale to enable the Company going forward to consider new business opportunities, it is highly likely that this will be to Francesco Vallone and/or other members of the operating management team. Any such disposal would be required to be dealt with in accordance with the AIM Rules, including seeking Shareholder approval.

 

Directors' Participation in the CVA

 

The Directors, under the terms of their existing service contracts and other arrangements as set out in the Admission Document, are currently owed in aggregate £250,378.77. Under the terms of the CVA the Directors are entitled to make a claim for these contractual amounts owing to them. Assuming all Creditors make a valid claim under the CVA, the Directors will receive 1p in the £1 pari passu with all other creditors, amounting to £2,503.79 in aggregate in final settlement of these amounts. Should fewer of the Creditors make a valid claim under the CVA then the amount issued to the Directors may increase.

 

Circular to Shareholders and Notice of General Meeting

 

Consequently, the Company is issuing today a Circular to Shareholders setting out the background to and the reasons for the Proposals and seeking Shareholders' approval for them. A Notice convening the General Meeting to be held at 11:00 a.m. on 24 October 2017, at the offices of Peterhouse Corporate Finance Limited, 15 Eldon Street, London EC2M 7LD, to consider the Resolutions, is set out at the end of the Circular.

 

Further information on the Proposals is set out in the Shareholder Circular which has today been published and is being posted to Shareholders. Copy of the Circular is also available on the Company's website: http://cogenpower.co.uk/ . The letter from the Non-executive Chairman of the Company as set out in the Circular has been reproduced in Appendix I below without material adjustment or amendment.

Update on Suspension

The Company's Ordinary Shares remain suspended from trading on AIM pending a completion of the Placing and the Proposals.

Board Changes

The Company announces that Ilaria Cannata has stepped down from the Board with immediate effect but continues to head up Corporate Development. The Board would like to thank Ilaria for her contribution to the Group.

Appointment of Nominated Adviser

The Company has today, with immediate effect, appointed Beaumont Cornish Limited as Nominated Adviser to the Company.

Total Voting Rights

Following completion of the Placing, the Company will have 270,166,760 Ordinary Shares in issue with voting rights. This figure may then be used by Shareholders in the Company as the denominator for the calculation by which they will determine if they are required to notify their interest in, or a change to their interest in, the share capital of the Company under the Financial Conduct Authority's Disclosure Guidance and Transparency Rules.

Market Abuse Regulation

The Market Abuse Regulation ("MAR") became effective from 3 July 2016. Market Soundings, as defined in MAR, were taken in respect of the proposed Placing with the result that certain persons became aware of inside information, as permitted by MAR. That inside information is set out in this announcement and has been disclosed as soon as possible in accordance with paragraph 7 of article 17 of MAR. Therefore, those persons that received inside information in a Market Sounding are no longer in possession of inside information relating to the Company and its securities.

 

Note: Capitalised terms in this announcement are as defined in the Circular dated 6 October 2017 unless the context otherwise requires.

 

Further enquiries:

 

Cogenpower plc

Dr. Francesco Vallone

Martin Groak

 

+39 011 4501466

+44 7949 209 301

info@cogenpower.co.uk

 

Beaumont Cornish Limited

(Nominated Adviser)

 

Roland Cornish

+44 (0)20 7628 3396

Peterhouse Corporate Finance Limited (Broker)

Heena Karani                                  Lucy Williams

+44 (0) 20 7469 0930

 

 

 

 

Beaumont Cornish Limited, which is authorised and regulated in the United Kingdom by the Financial Conduct Authority, is acting for the Company and no one else in connection with the Placing and the Proposals and will not be responsible to any person other than the Company for providing the regulatory and legal protections afforded to clients of Beaumont Cornish Limited nor for providing advice in relation to the contents of this announcement or any matter, transaction or arrangement referred to in it. Beaumont Cornish Limited has not authorised the contents of, or any part of, this announcement and no liability whatsoever is accepted by Beaumont Cornish Limited for the accuracy of any information or opinion contained in this announcement or for the omission of any information.

 

Peterhouse Corporate Finance Limited, which is authorised and regulated in the United Kingdom by the Financial Conduct Authority, is acting for the Company and no one else in connection with the Placing and the Proposals and will not be responsible to any person other than the Company for providing the regulatory and legal protections afforded to clients of Peterhouse Corporate Finance Limited nor for providing advice in relation to the contents of this Circular or any matter, transaction or arrangement referred to in it. Peterhouse Corporate Finance Limited has not authorised the contents of, or any part of, this Circular and no liability whatsoever is accepted by Peterhouse Corporate Finance Limited for the accuracy of any information or opinion contained in this Circular or for the omission of any information

 

FORWARD LOOKING STATEMENTS

 

Certain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ''believe'', ''could'', "should" ''envisage'', ''estimate'', ''intend'', ''may'', ''plan'', ''will'' or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.



 

 

 

 

Appendix I

 

The letter from the Non-executive Chairman of the Company as set out in the Circular to Shareholders has been reproduced below without material adjustment or amendment. Defined terms in this announcement have the meaning set out at the end of this announcement in Appendix II.

 

Proposals for:

Company Voluntary Arrangement

Proposed Placing

and

Notice of General Meeting

 

Introduction

 

On 26 June 2017, the Company announced the suspension of trading of its securities on AIM for failing to publish its audited annual report and accounts for the year ended 31 December 2016. The Company also announced that the Company's working capital position was constrained due to a dispute over the payment of green certificate incentives by the GSE, the Italian supervisory agency for energy incentives.

 

Notwithstanding the publication of the Company's 2016 Accounts and Half-Yearly Report ended 30 June 2017 on 29 September, the Company's shares remain suspended from trading, whilst the Company was in advanced discussions on a potential fundraising from new investors to put the Company in an improved working capital position.

 

There had been ongoing discussions with major infrastructure funds and other investors with regards to the provision of further funding for the Group to extend its existing operations and undertake new projects. However, these were not successful and the Board concluded that it was in the best interests of the Company to enter into a CVA and complete a Placing.

 

Consequently, the Company is issuing a Circular to Shareholders setting out the background to and the reasons for the Proposals and seeking Shareholders' approval for them. A Notice convening the General Meeting to be held at 11:00 a.m. on 24 October 2017, at the offices of Peterhouse Corporate Finance Limited, 15 Eldon Street, London EC2M 7LD, to consider the Resolutions, is set out at the end of this Circular.

 

Peterhouse Corporate Finance Limited has, as Broker to the Company, conditionally raised £550,000 before expenses by way of the Placing at £0.0025 per Ordinary Share. The Placing is conditional on, inter alia, the passing of the Resolutions, CVA Approval and Re-trading. The proceeds of the Placing will allow the Company to implement the CVA, if approved, and to provide the Company with working capital to allow it to continue to trade, further details of which are set out below.

 

Shareholders should be aware that the Placing is conditional upon CVA Approval, the passing of the Resolutions and Re-trading. If any of the above conditions are not satisfied, then the Placing will not proceed and since as the Company would then have insufficient working capital to continue to trade as a going concern and, in the absence of any other source of funding, the Joint Supervisor may have no alternative but to place the Company into creditors' voluntary liquidation.   

 

Information on Cogenpower

 

Cogenpower Plc was founded in November 2014 and in August 2015, through a share-for share exchange, acquired 100 per cent. of Cogenpower S.p.A. (since renamed Cogenpower s.r.l). Cogenpower s.r.l is a company based near Turin, Italy, which has been in operation since 2004, focussing on selling heat from its ultra-high efficiency plant. Cogenpower s.r.l. has two Italian subsidiaries located within suburban Turin, one of which is in the process of being liquidated following the withdrawal by the Group from the retail gas and electricity supply business.

 

The Group is a low carbon energy business focused on the provision and development of 'Combined Heat and Power and District Heating' (CHPDH) networks in towns and cities with populations below 50,000.

 

The Group has three distinct business units:

 

●          The operation of CHPDH projects that comprise a power plant, which can run on natural gas and/or other fuel, able to produce simultaneously electricity and heat, and a district heating network to deliver the produced heat to private and public residential and office buildings and other facilities. It is over 92 per cent energy efficient; 

 

●          Retrofitting blocks of flats and commercial buildings with condensing boilers or micro CHP plants to supply residents with heat and electricity; and consultancy services for advanced power solutions; and

 

●          Retailing electricity and natural gas to a mixture of domestic and commercial consumers. This business unit ceased acquiring new business in September 2016 and is being wound down.

 

As previously announced, as at 30 June 2017, the Group had €7.7 million of net current liabilities. The Board is currently seeking to restructure the indebtedness of the recently closed Italian retail subsidiary, which has the highest level of indebtedness.

 

Background to and reasons for the CVA

 

1.    Legacy debts and net current liabilities on Admission

 

The Admission Document disclosed, as at 30 June 2015 (the latest period reported on in the Admission Document) a financial situation of net current liabilities of approximately €7 million. By 31 December 2015, this had increased to €8 million (excluding Esseti's net current liabilities). This was a challenging starting position for the Group at IPO, but a number of major creditors gave the Group support, by exchanging debt for equity and/or agreeing deferred payment terms.

 

 

2.   Green Certificates

 

The Company was entitled to earn Green Certificates (GCs) because the by-product heat which it circulates around the town is waste heat and therefore essentially CO2 -free. GCs are regulated by the GSE, the Italian electricity supervisory body, and in 2016 GSE also became responsible for settling amounts owed to holders of GCs.

 

In 2016, the GSE withheld payment in respect of the Company's GCs for reasons that have been demonstrated in court to be spurious.

 

The Board consider that GSE's actions effectively deprived the Group of €1.6 million of cash flow between June 2016 and June 2017. The GSE sought not only to reduce the Company's legitimate entitlement to GCs for 2015 and part of 2016 (after which the GC scheme ended), but also to amend retrospectively the Company's prior years' entitlements that the GSE had verified and approved. The GSE did not accept that it owed the Company €1.6 million, and instead GSE claimed that the Company owed GSE €900k. This had a profound impact on the Group, requiring it to defer further agreed sums under the series of deferred payment agreements.

 

As announced, the result of a recent Italian court hearing supported the Company's position and an anti-state-monopoly law has just been passed by the Italian Parliament, making such retroactive changes illegal. Nevertheless, this ongoing dispute and consequent lack of working capital has had a huge impact on the Company and its ability to raise funds for its operations, thereby adversely impacting on the strategic development plan.

 

3.   Esseti

 

Esseti Energia srl ("Esseti") was a biomass-based producer of electricity, attracting large feed-in-tariffs, which was acquired by Cogenpower's subsidiary in December 2015. Extensive due diligence was conducted prior to the acquisition. However, the Board did not become aware until after the IPO that Esseti had over-declared its entitlement to incentives. In addition, Esseti had failed to comply with mandatory regional development requirements and therefore could be shut down at any point. The Company persuaded the original owner to buy the business back, with the return of the €134,000 invested by the Group. However, Esseti still owes Cogenpower a balance of over €100,000. Subsequently, the Esseti plant was forced to shut due to its regional non-compliance and the Directors consider that the outstanding sum due from Esseti is now unlikely to be recovered.

 

The removal of Esseti's previously expected contribution from the Company's business plan removed approximately £450,000 per year in budgeted EBITDA and made it very difficult to fund Cogenpower's parent company administrative and ongoing listing costs from continuing operations. In addition, a subsequent dispute with the Italian lawyers who conducted the due diligence on Esseti on behalf of the Group resulted in their impeding the payment of a government CO2 incentive of €400,000 to the Italian subsidiary.

 

4.   The IPO

 

The IPO process began in the Spring of 2015; however, the IPO itself did not occur until almost a year later, on 12 February 2016.

 

Prior to the summer of 2015, Cogenpower was eligible for EIS investment; but during the summer of 2015, the rules on EIS-qualifying investments changed. Following these changes, Cogenpower failed to qualify for EIS investment and this had a significant impact on fundraising; and the extended nature of the IPO process meant that preparatory organisation costs were increased. 

 

Conclusion

 

In conclusion, the combination of events described above have led to significant working capital issues, with significant legacy debts and obligations not being cleared. The Board has tried to raise additional funds but has not been successful, despite a great deal of interest having been shown in the Group's technology.

 

Shareholders should note that it is the Board's current belief that it may be in the best interests of the Company to dispose of the Group's operating business in as simple and as least costly a manner as possible. Given that the Company would not wish to provide anything more than basic warranties as to ownership to any purchaser, and given the intended timescale to enable the Company going forward to consider new business opportunities, it is highly likely that this will be to Francesco Vallone and/or other members of the operating management team. Any such disposal would be required to be dealt with in accordance with the AIM Rules, including seeking Shareholder approval.

 

If the Proposals are not approved, the Directors believe that the only alternative is likely to be for the Company to be placed into creditors' voluntary liquidation.

 

The Board therefore considers that it is now in the best interests of Cogenpower's Creditors and Shareholders to approve the Proposals. 

 

 

Company Voluntary Arrangement

 

The Company currently has outstanding unsecured and preferential creditors of approximately £2,200,000. It is proposed that the Company's creditors will receive £0.01 for every £1 of debt. The CVA is conditional on the resumption of trading of the Company's securities on AIM.

 

The Directors have appointed Antony Batty and Hugh Jesseman of Antony Batty and Company to act as Joint Nominees in respect of the proposal of the Directors for a Company Voluntary Arrangement. Mr Batty and Mr Jesseman have provided their consent to act and their Nominee's Report has been filed at Court as required.

 

A CVA requires the approval of 75 per cent. or more by value of the Creditors voting on the resolution in person or by proxy. If approved by such a majority, for such resolution to be valid, not more than half in value of Creditors who are not "connected" with the Company shall have voted against the resolution. Once approved, the CVA binds all relevant creditors who were entitled to vote whether or not they were present or represented at that meeting and so voted and whether or not they actually received notice of the meeting.

 

A CVA also requires Shareholder approval. The CVA must be approved by in excess of 50 per cent. by value of Shareholders, present in person or by proxy and voting on the resolution. The value of Shareholders is determined by reference to the number of votes conferred on each member by the Company's articles of association. Approval of the CVA is part of the Resolutions, which is being proposed as an ordinary resolution, and therefore requires the approval of 50 per cent. by value of Shareholders present in person or by proxy and voting on the Resolution.

 

The Directors expect that the CVA will be approved at meetings to be held at 10:30 a.m. (in the case of Creditors) and 11:00 a.m. (in the case of Shareholders) on 24th October 2017.

 

For the avoidance of doubt, Shareholders will retain their existing Ordinary Shares in the Company and the CVA will not result in any distribution being made to Shareholders of the Company in their capacity as Shareholders.

 

A copy of the Directors' proposal incorporating the Nominee's Report will be available for download from the following:

 

Website: http://www.antonybatty.net/   

Password: 524462219 

 

Any Shareholder wishing to receive a paper copy of the proposal, should contact Antony Batty on 020 7831 1234, or email antonyb@antonybatty.com, or in writing to Antony Batty, 3 Field Court, London WC1R 5EF.

 

The CVA is conditional upon the approval of the Resolutions, the Placing and Re-trading.

 

Directors' participation in the CVA

 

The Directors, under the terms of their existing service contracts and other arrangements as set out in the Admission Document, are currently owed in aggregate £250,378.77. Under the terms of the CVA the Directors are entitled to make a claim for these contractual amounts owing to them. Assuming all Creditors make a valid claim under the CVA, the Directors will receive 1p in the £1 pari passu with all other creditors, amounting to £2,503.79 in aggregate in final settlement of these amounts. Should fewer of the Creditors make a valid claim under the CVA then the amount issued to the Directors may increase. The amounts owing to the Directors and the total amount to be paid to them under the CVA should it proceed is set out below:

 

 

Director

Contractual amount owing

Amount anticipated to be paid out under the CVA

Richard Day

 

 

£55,082.14 (Salary)

£239.73 (Expenses / other)

£553.22

David Pickering

£72,000.00 (Salary)

£1,356.90 (Expenses / other)

 

£733.57

 

Martin Groak

£120,000.00 (Salary)

 £1,700 (Expenses / other)

£1,217.00 

 

The Placing

 

Peterhouse has conditionally raised £550,000 before expenses through the Placing. The Placing is conditional on CVA Approval, approval of the Resolutions and Re-trading. The net proceeds of the Placing are estimated at £400,000.

 

The proceeds of the Placing will allow the Company to implement the CVA, if approved, and will be used for working capital purposes.

 

Following completion of the Placing, the Investors will, in aggregate, hold approximately 81.43 per cent. of the Enlarged Share Capital. The Placing Price of 0.25 pence per share represents a discount of approximately 92.3 per cent. to the closing mid-market price of 3.25 pence per Ordinary Share on 26 June 2017, being the date on which trading in the Company's Ordinary Shares on AIM was suspended.

 

The Placing Shares, when issued, will be fully paid and will rank pari passu in all respects with the existing Ordinary Shares, including the right to receive all dividends and other distributions declared, made or paid after the date of issue.

 

Application will be made for the Placing Shares to be admitted to trading on the AIM and, subject to Creditors' approval of the CVA and Shareholders' approval of the Proposals, Admission is expected to take place on or around 25th October 2017.

 

If the CVA is approved by Shareholders and Creditors, then the Company's current indebtedness and liabilities will be eliminated. Following completion of the Placing, the Company will have the necessary funds to continue to trade on AIM.

 

The Company has agreed to pay Peterhouse commissions of 5 per cent on all amounts introduced by them. In addition, the Company has agreed to issue to Peterhouse and the Nominated Adviser warrants to subscribe for up to such number of new Ordinary Shares as is equal to 2 per cent and 1 per cent respectively of the Enlarged Share Capital from time to time, exercisable at the Placing Price at any time in the period of 3 years following the Re-trading.

 

Shareholders should be aware that the Placing is conditional upon the passing of the Resolutions, the CVA Approval and Re-trading. If these conditions are not met, then the Placing will not proceed, and the Company would then have insufficient working capital to continue as a going concern and, in the absence of any other source of funding, the Joint Supervisors may have no alternative but to place the Company into creditors' voluntary liquidation. 

 

Use of Proceeds

 

The proceeds of the Placing will be used to settle outstanding Creditors under the terms of the CVA, as set out above, and the remainder will be used to ensure the Company has ongoing working capital. Following the settlement of Creditors as part of the proposed CVA, the Company will be free of debt.

 

Share Capital

 

The Company is seeking authorisation to allot:

 

1.   the Placing Shares; and

2.   further Ordinary Shares up to a maximum amount equal to 100 per cent. of the Company's Enlarged Issued Share Capital for cash

 

to enable the Proposals to be implemented and further funds to be raised in due course.

 

Business Review

 

The Board is undertaking an extensive assessment of the Company's current business. The assessment includes consideration by the Board as described above of the potential disposal of the Group's remaining operating subsidiaries. Shareholders should note that the Board's current belief that it may be in the best interests of the Company and Shareholders to dispose of the Group's operating business in as simple and as least costly a manner as possible.

 

As and when the Board review is concluded, and a decision is made, if it is to dispose of the Group's operating subsidiaries, this will be put to Shareholders for approval. Following a disposal of the Group's remaining operating business, the Company would then become an AIM Rule 15 cash shell.

 

General Meeting

 

If the Resolutions are not passed, the Proposals will not proceed and since the Company would have insufficient working capital to continue as a going concern, the Directors may have no alternative but to place the Company into creditors' voluntary liquidation. Having taken appropriate professional advice the Directors believe it highly unlikely, in such circumstances, that Shareholders would be able to recover any value for their Ordinary Shares. The Notice convening the General Meeting at which the Resolutions will be proposed is set out at the end of this Circular. A summary of the Resolutions is set out below. 

 

The Resolutions

 

The Resolutions, which will be proposed as ordinary and special resolutions, seek:

 

·      Approval of the 2016 Accounts;

 

·      Appointment of Welbeck Associates as auditors;

 

·      Approval for the CVA;

 

·      To authorise the Directors to issue shares pursuant to section 551 of the Companies Act 2006; and

 

 

Action to be taken

 

Shareholders will find a Form of Proxy enclosed for use at the General Meeting. Whether or not you intend to be present at the General Meeting, you are requested to complete and return the Form of Proxy in accordance with the instructions printed thereon as soon as possible.

 

To be valid, completed Forms of Proxy must be received by the Company's registrars, SLC Registrars, 42-50 Hersham Road, Walton-on-Thames, Surrey KT12 1RZ UK not later than 11.00 a.m. on 20th October 2017, being 48 hours (two working days) before the time appointed for holding the General Meeting.

 

You are entitled to appoint a proxy to attend and to exercise all or any of your rights to vote and to speak at the General Meeting instead of you. Completion of the Form of Proxy will not preclude you from attending and voting at the General Meeting in person if you so wish. Your attention is drawn to the notes to the Form of Proxy.

 

 

 

Recommendation

 

The Directors consider that the Placing and the Proposals are in the best interests of the Company, its Creditors and the Shareholders as a whole, as the only alternative, in the absence of any other source of funding, will be creditors voluntary liquidation, which the Directors believe would deliver very little or no value to the Company's Shareholders. The Directors therefore unanimously recommend that Shareholders vote in favour of the Resolutions as they intend to do themselves in respect of their own shareholdings which amount, in aggregate, to 38,461,998 Ordinary Shares representing approximately 76.7 per cent. of the existing issued ordinary share capital.

 

Yours faithfully,

 

 

 

David Pickering

Non-Executive Chairman

For and on behalf of the Board

Cogenpower PLC

 

 

 

 

 

 

Appendix II

 

Definitions

 

The following definitions apply throughout this announcement unless the context requires otherwise:



"2016 Accounts"

Report and Accounts of the Company for the financial year ended 31 December 2016





"Admission"

the admission of the Placing Shares to trading on AIM becoming effective



"Admission Document"

the Company's admission document published on 5 February 2016 in connection with the IPO



"AIM Rules"

 

the AIM Rules For Companies, whose securities are admitted to trading on AIM, as published by the London Stock Exchange from time to time

 

"AIM"

 

the market of that name operated by the London Stock Exchange

 

"Articles"

the articles of association of the Company

 

"Board" or "Directors"

David Pickering, Francesco Vallone, Martin Groak and Richard Day

 

"CHPDH"

Combined Heat and Power and District Heating



"Circular" or "Document"

 

this document, containing details of the Proposals

"Company" or "Cogenpower"

Cogenpower PLC, a company registered in England and Wales with registered number 09301329

 

"Cogenpower srl"

Cogenpower srl, a company registered in Italy with registered number TO-1009761



"Creditors"

creditors of Cogenpower



"Creditors' Meeting"

 

the meeting of creditors to be convened at 10.30 a.m. on 24th October 2017 pursuant to the CVA

 

"CVA"

 

a Company Voluntary Arrangement, pursuant to Part 1 of the Insolvency Act 1986, details of which are set out in this document and a proposal document made available to Creditors and Shareholders dated 29th September 2017

 

"CVA Approval"

 

approval of the terms of the CVA at the Creditors' Meeting convened for such purposes

 

"Enlarged Share Capital"

 

the issued ordinary share capital of the Company following the issue of the Placing Shares

 

"Esseti"

Esseti Energia srl, a former subsidiary of Cogenpower srl, incorporated under the laws of Italy



"FCA"

the Financial Conduct Authority



"Form of Proxy"

 

the form of proxy accompanying the Circular for use at the General Meeting

 

"GCs"

Green Certificates



"General Meeting"

the General Meeting of Shareholders to be convened for 11:00 a.m. on 24th    October 2017

 

"Group"

 

the Company and its Subsidiaries

 

"GSE"

Gestore dei Servizi Energetici, the Italian Electricity Services Operator



"HMRC"

HM Revenue & Customs

 

"Joint Nominee" or "Joint Supervisor"

Antony Batty and Hugh Jesseman of Antony Batty & Company



"Issued Share Capital"

the 50,166,760 Ordinary Shares in issue as at the date of the Document



"Investors"

the subscribers for the Placing Shares under the Placing

 

"IPO"

Initial Public Offering



"London Stock Exchange"

 

the London Stock Exchange PLC

 

"Meetings"

 

the Creditors' Meeting and the General Meeting

"Nominated Adviser"

Beaumont Cornish Limited, the Company's Nominated Adviser in accordance with the AIM Rules

 

"Ordinary Shares"

 

ordinary shares of 0.25p par value in the capital of the Company

 

"Peterhouse"

Peterhouse Corporate Finance Limited, a company incorporated in England and Wales with company number 02075091 (authorised by the FCA with firm reference number 184761) and having its registered office at 15 Eldon Street, London, EC2M 7LD

 

"Placing"

the conditional placing by Peterhouse on behalf of the Company of the Placing Shares

 

"Placing Price"

£0.0025 per Placing Share

"Placing Shares"

up to 220,000,000 new Ordinary Shares to be issued pursuant to the Placing

 

"Proposals"

 

The proposals set out in this Circular, whereby Shareholders are being asked to consider, and if thought fit, approve (i) the 2016 Accounts (ii) the appointment of the new auditor (iii) the terms of the CVA; and (iv) the authority to allot Ordinary Shares on a non-pre-emptive basis. 

 

"Re-trading"

the resumption of trading in the Ordinary Shares on AIM following the lifting of the temporary suspension in trading

 

"Resolutions"

 

the resolutions set out in the Notice of General Meeting contained within the Circular

 

"Shareholders"

 

holders of Ordinary Shares

 

"Subsidiaries"

 

Cogenpower's wholly-owned subsidiaries

"Welbeck"

Welbeck Associates Limited, the Company's auditor

 

 

 

 

 

Appendix III

EXPECTED TIMETABLE OF PRINCIPAL EVENTS

 


2017

Publication of the Document

6th October

Latest time and date for receipt of Forms of Proxy in respect of the General Meeting

10:00 a.m. on 20th October

Meeting of Creditors to consider the CVA   

10:30 a.m. on 24th October

General Meeting

11:00 a.m. on 24th October

Re-trading on AIM

on or around 25th October

Crediting of Placing Shares to Crest Accounts

on or around 25th October

Despatch of certificates for Placing Shares in certificated form

by 27th October



Notes

 

1.     References to times in this announcement are to London time unless otherwise stated.

 

2.     If any of the above times or dates should change, the revised times and/or dates will be notified to Shareholders by an announcement on an RNS (and posted on the Company's website) in accordance with the Company's articles of association.

 

3.     All events in the above timetable following the General Meeting are conditional upon approval by the Shareholders of the Resolutions.

 

 

Appendix IV

SHARE ISSUE STATISTICS

 

 

Current number of Ordinary Shares in issue

50,166,760

Placing Price

£0.0025

Number of Placing Shares

220,000,000

Enlarged Share Capital

270,166,760

Placing Shares as a percentage of the Enlarged Share Capital

81.43 per cent.

Gross proceeds of the Placing

£550,000

Estimated expenses of the Placing, CVA and associated costs 

£150,000

 

 

ENDS

 